September 3, 2019

Please reload

Recent Posts

A4095 Road Closure by Pye Homes Site

May 16, 2019

1/3
Please reload

Featured Posts

Temporary Traffic Lights - A4095 - Long Hanborough

January 8, 2019

 

 

Temporary traffic lights have been approved for 2 way 24 hr lights whilst essential gas works by SGN take place. 

 

Work will begin near to the George & Dragon pub and will continue to the West along the A4095 finishing near to Riely Close. 

 

The traffic lights will be in place from 14.01.2019 to 22.03.19. The maximum length of works between the lights is to be 150 metres.

 

They will have to be manually operated from 06.30 to 09.30 and 15.30 to 19.00 also at the weekends.

 

Lights must be manually controlled as required at this location by a trained competent person.

 

This direction is given under section 56 of the NRSWA. As set out here: http://www.legislation.gov.uk/ukpga/1991/22/section/56

 

When not in use lights must be removed from the carriageway.

Share on Facebook
Share on Twitter
Please reload

Follow Us
Please reload

Search By Tags